Business tool

Inventory reorder-point scenario planner

Compare unreserved stock with lead-time demand and a chosen buffer.

Your inputs

Your results

Ready when you are
Add your inputs or try an example.
Your results will appear here.

Compare two scenarios.

Run the tool, then save A or B to compare headline results and entered values. Keep currencies, periods and assumptions consistent.

Saved scenarios stay in this browser until you clear them. Reset clears the working result; it keeps saved scenarios. Use Clear saved scenarios on a shared device.

Run the tool to save your first scenario.

How it works

Add constant demand during replenishment lead time to the safety-stock buffer you choose. Compare the upward-rounded threshold with unreserved on-hand stock and model when that threshold would be reached.

Threshold = ceil(daily demand × lead days + safety stock). Available = on hand − reserved. Days until threshold = max(0, (available − threshold) / daily demand).
Read the source reference ↗

A few things to know

No forecast, automatic orders or service-level promise. Excludes on-order receipts and demand variability. Zero demand has no time estimate. Stock counts must be whole units; inputs capped at one billion and unsafe thresholds rejected.

Results use your inputs. Keep all money amounts in the same currency.

A little context

When to use this tool

A reorder point is a threshold to compare with available stock under stated replenishment assumptions. Enter average daily demand, lead time and the buffer you choose. The planner rounds the threshold upward to a whole unit, subtracts reserved units from on-hand stock, and shows the constant-demand time until the threshold. Safety stock is an input here, not a statistical service-level calculation. Pending receipts, demand changes and supplier calendars can all change the operational decision, so use the result as a scenario rather than an automatically placed order.

  • Compare stock with demand during a stated lead time.
  • Test a different user-selected safety-stock buffer.
  • Examine how reserved stock changes available units.

How to use inventory reorder-point scenario planner

  1. Enter demand and lead time

    Use average units per day and replenishment days on a consistent basis. Fractional demand and lead days are supported.

  2. Declare whole stock counts

    Enter safety-stock buffer, on-hand stock and reservations as whole units. Reservations cannot exceed on-hand stock.

  3. Compare the threshold and time

    Review the rounded threshold, available units and at-or-below status. Zero demand produces an unavailable time estimate; the model does not display infinite days as a recommendation.

Try the numbers

A 100-unit replenishment threshold

Inputs

Daily demand 8, lead time 10 days, buffer 20, on hand 150, reserved 10.

Result

Threshold is 100 units. Available stock is 140. At constant demand, it reaches the threshold in 5 days.

What it means

The scenario excludes incoming stock and does not promise a supplier delivery date or service level.

Common mistakes to avoid

Counting reserved stock as available

Subtract reservations before comparing with the threshold.

Calling the selected buffer a calculated guarantee

The buffer is your assumption; demand distributions and service-level probabilities are not modeled.

Ignoring incoming orders

Pending receipts are deliberately excluded and may materially change an actual replenishment decision.

Useful answers

Frequently asked questions

Definitions, edge cases, and practical next steps for this tool. Search all tool FAQs ↗

How is the threshold calculated?

Multiply average daily demand by lead days, add the selected safety-stock units and round upward to a whole unit.

Why round upward?

The output is a whole-unit threshold. A small fractional requirement is rounded to the next whole unit rather than understating the modeled quantity.

What is available stock?

On-hand stock minus reservations. This does not include purchase orders, transfers or stock at another warehouse.

What does at or below mean?

The current available count is no greater than the threshold. The tool identifies that relationship; it does not submit a purchase order.

What happens with zero demand?

The threshold can still include your buffer, but time-to-threshold is unavailable. There is no division by zero or operational claim of infinite runway.

Are lead days business days?

Use your own consistent replenishment-day assumption. The calculator does not inspect supplier calendars, weekends, holidays or transport schedules.

Does this calculate safety stock statistically?

No. You choose a buffer. Variable demand distributions, service levels and seasonal forecasts are outside this scenario.

How is this different from inventory turnover?

Turnover describes a historical period’s inventory use. This compares stock with a prospective lead-time demand and buffer assumption.

Sources and method

Use the references below to check definitions and platform guidance. The model’s scope and limits are explained above. Read our editorial standards.

Help

How can we help?

Find instructions, report a problem, or leave a message.

Read this tool’s FAQs ↗

Common questions

Where do I start? Try an example, then replace its values with yours.

Why did my upload fail? Check the field error, accepted format and file-size limit. Start with a small sanitized sample.

Where are my results? Review the result panel, then use its copy or download controls. If a calculation fails, check the error beside the input.

Message us

Chat opens Tawk.to. It processes your messages and connection data. Do not paste private inputs or file contents. Availability and response times vary.